-\textcolor{blue}{Answer: The prediction models in [5] and [6] are for homogeneous and heterogeneous clusters respectively, while eq. 2 is for a grid. where the homogeneous cluster predication model was used one scaling factor denoted as $S$, because all the nodes in the cluster have the same computing powers. Whereas, in heterogeneous cluster prediction model all the nodes have different scales and the scaling factors have denoted as one dimensional vector $(S_1, S_2, \dots, S_N)$. The execution time prediction model for a grid Equation (2) defines a two dimensional array of scales
-$(S_{11}, S_{12},\dots, S_{NM_i})$. We have added this to the paper (page 8).}